Brief
To construct our client’s triple car garage on a new concrete slab
Key features
Due to the size of the new slab, we appointed a team of ground workers to dig and cast the concrete to structural engineers specification
We constructed the perimeter wall out of reclaimed bricks provided.
Assembled the extensive oak frame and pegged it together. A telescopic handler was used to lift the large of the sections of timber into position.
The roof was covered in tongue and groove Thermowood boards.
The walls were clad in oak featheredge boards .
We contracted a roofer to felt, lath and slate with reclaimed Welsh slates.
Aluminium guttering was mounted to all sides with downpipes to pre-installed gullies.

Proudly supporting Yorkshire Air Ambulance – helping to save lives across our region.
Follow us for the latest updates and news: